Lane Closure Services
Contact UsLane closures need more than cones
A lane closure changes how drivers, cyclists, pedestrians, transit, deliveries, and emergency vehicles move through a street. The field setup must match the approved plan, permit window, work activity, road geometry, and live conditions.
Safeside supports approved lane closures with trained personnel, temporary devices, setup and takedown, field coordination, and monitoring. The project owner remains responsible for obtaining authority approval unless another arrangement is confirmed in writing.
Lane-closure planning inputs
- Road authority and approved closure limits
- Dates, permitted hours, setup and takedown windows
- Travel lanes, turn lanes, bike lanes, sidewalks, shoulders, and parking affected
- Transit stops, driveways, intersections, business access, and emergency routes
- Work vehicles, deliveries, staging space, and changing phases
Municipal and provincial requirements
Requirements vary by road authority. For example, the City of Vancouver construction street-use process covers work occupying public street space, while the City of Coquitlam closure-permit process applies when construction work accesses City road right-of-way. Always check the current authority page for the project address.
Frequently asked questions
Can Safeside close a lane before the permit is approved?
No closure should be implemented outside the applicable approval and permit conditions. Send the approved documents before the scheduled mobilization.
Can the closure layout change during the shift?
Changing hazards may require the risk assessment and plan to be reviewed. Material changes to an approved closure can also require authority approval. The field crew should not improvise beyond its authorized scope.